A different soil sample is taken if these threads can't break. This process are going to be recurring with much less water In case the threads can't split. It proceeds in this manner until finally, last but not least, the thread breaks. The next is often a summary of https://martinkzlyk.losblogos.com/29096339/rumored-buzz-on-geotechnical-pile-foundation-bd