The main park contains a ability of 200 MW even though Sandrini II includes a capability of 100 MW. The overall expense of both of those tasks weren't disclosed having said that, in the course of building, about two hundred personnel have been utilized. The tasks are anticipated to find https://californiasolarservices.water.blog/2024/09/13/why-buy-maintenance-services-from-solar-companies-bakersfield/