As viewed from your figure down below, continuous auger is accustomed to drill the borehole, raise up drilled soil, and pour concrete whilst the auger is moved up. As a result, the borehole would not want casing or hydrostatic stress to avoid damage to the borehole wall. Purpose of this https://shanevclqu.blogminds.com/a-review-of-cast-in-situ-piles-29890196